SUCCESS STORIES

Industrial

“Design & Build” HVAC solution for Drilift FZC, RAK

Scope of Work:
Designed, supplied, and installed 2 × 150TR air-cooled chillers with primary CHW pumps featuring variable primary flow to support both jacket cooling and space conditioning. The project included complete engineering of ducting, chilled water piping, valve packages, and integration of a Chiller Plant Manager system.

  • The project was completed on schedule with successful commissioning, delivering precise and reliable cooling for both jacket temperatures and facility spaces.

  • Integrated systems ensured optimized operational efficiency, seamless control, and long-term performance for the client’s critical processes.
Residential

“HVAC Retrofit Solution” for C-92, Abu Dhabi

Scope of Work:
Successfully executed a turnkey HVAC replacement for an existing building, involving the removal of an old chiller and installation of a new high-efficiency advance technology VFD chiller. The project included full engineering, crane-assisted lifting, electrical modifications, chilled water piping, valve packages, and coordination for ICT approvals.

  • Completed before schedule, the project ensured seamless commissioning and restored reliable cooling for the building.

  • The integrated solution enhanced system efficiency, improved operational control, and delivered a fully modernized HVAC infrastructure with minimal disruption to building operations.
Mixed use

“Chiller Plant Modernization” for Mixed use facility, Abu Dhabi

Scope of Work:
Successfully modernized an existing chiller plant, upgrading two chillers to enhance capacity and performance. The project included retrofitting equipment, converting the network from constant primary to variable primary flow, and implementing optimized control strategies for improved energy efficiency. Comprehensive upgrades also covered pumps, piping, valve packages, and advanced automation for precise system management.

  • Completed on schedule, the modernization delivered higher capacity, reduced energy consumption, and extended equipment lifecycle.

  • The upgraded plant now provides reliable, efficient cooling with enhanced operational control, improved system responsiveness, and measurable long-term savings for the facility.